News archive

WO07.2 User Info

Created by M. Wolf |

Expansion-joint sealing cushions (valve) for refurbishing bridges and tunnels

Main Station, Vienna
Expansion joint length 27 m
Sealing against the passage of water

Time taken 45 min
Installation carried out by: ARGE/ ÖBB-Austria


Railwaybridgeoverthe B522 road
Expansion joint length 46 m
Sealing against water and stones falling from a height of 7.5 m

Time taken 360 min
Installation carried out by: DB Netz AG

[Translate to English:]
[Translate to English:]

Wolf GmbH

Zazenhäuser Straße 52
D - 70437 Stuttgart

Tel.:  +49 (0)711 87 39 41
Fax.: +49 (0)711 87 12 30

Email: Service(at)Wolf-Systems.com