News archive

Sealing of expansion joints against stone chippings and water flow

Created by M.Wolf |

WO03-14 - 12th Pilot Project
Sealing of expansion joints against stone chippings and water flow

Wolf GmbH, of Stuttgart was commissioned by DB Netz AG Hannover with the task of finding a quick but lasting solution for sealing a 46-metre long expansion joint against stone chippings and water flow. The railway bridge crosses the B522 highway to Hanover airport. Due to defective joint sealing tapes, the passage of trains causes small stones to fall through the 46-metre expansion joint onto the road below. Fortunately, this has so far not caused any accidents or serious damage.

Wolf GmbH

Zazenhäuser Straße 52
D - 70437 Stuttgart

Tel.:  +49 (0)711 87 39 41
Fax.: +49 (0)711 87 12 30

Email: Service(at)Wolf-Systems.com